First Draft 3-15-97
Design Standards
EGD / Colonoscopy Procedures Room
ARCHITECTURAL
CONDITIONING
Ceiling:
Dry Bulb Temp Cooling:
25C (78F)
Ceiling Ht:
2740 mm (9'-0")
22C (72F)
Wall Finish:
Paint
Minimum % Outside Air:
--
Ceramic Tile in Toilet Room
Yes
Wainscot:
--
Noise Criteria:
NC-40
Base: Resilient sheet flooring w/ integral base
Steam:
--
Floor Finish:
Resilient sheet flooring
Relative Humidity/Cooling:
50%
Ceramic Tile in Toilet Room
Relative Humidity/Heating:
30%
Slab Depr:
--
Minimum Air Changes/Hr.:
6
Notes: 1. 900mm (3'-0") wide entry door.
Room Pressure:
Negative
SPECIAL EQUIPMENT
AC Load Lighting:
30 w/sm (2.8 w/sf)
None
AC Load-Equipment:
54 w/hr (5 w/hr)
Number of People:
4
LIGHTING
--
General:
EGD & Colonoscopy Rm.: 100 FC
Notes:
Toilet Rm.: 30 FC
PLUMBING AND MEDICAL GASES
Special:
--
Cold Water:
Yes
Notes: 1. 50% of lighting on critical power.
Hot Water:
Yes
fluorescent light fixture, acrylic
Laboratory Air:
--
prismatic lens, W/3-F32T8 lamps,
Laboratory Vacuum:
--
4100K, CRI=85 (Minimum)
Sanitary Drain:
Yes
3. 300 x 1200 mm (1'x4') surface
Reagent Grade Water:
--
mtd. fluorescent light fixture,
Medical Air:
Yes
acrylic prismatic lens, W/2-F32T8
Medical Vacuum:
Yes
lamps, 4100K, CRI=85
Oxygen:
--
(Minimum)
Notes:
POWER
General:
Emergency:
Notes:
--
COMMUNICATION
ADP:
Yes
Radio:
--
Telephone:
Yes
Intercom:
--
Pub. Addr
--
Notes:
1. Nurse Call
VA DESIGN GUIDE
AMBULATORY CARE INVASIVE PROCEDURES SUITE
PAGE 5-3