ARCHITECT-ENGINEER CONTRACT
ATTACHMENT I
SPECIAL PROVISIONS
Page 41
UPDATED ~ OCTOBER 2006
Format B
A/E's ESTIMATE OF ADJUSTMENT IN CONTRACT AMOUNT
ANALYSIS OF ESTIMATED MANHOURS FOR DRAWINGS
Sheet____of _____
ESTIMATED
TIME IN
MANHOURS
DWG. NO.
ITEM NO.
(If new
(Circle
CODE
Technical
Total for
indicate
on
LETTER 2/
Designer
Draftsman
Total
Supervision
Drawing
thus:
Drawing
Of Work
"new")
1/
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
TOTAL
1/ Submit blueprints of drawings requiring revision, indicating the portion of drawings which need
revision by circling the portion(s) and identifying each by numbering in Column (2) above.
2/ For Column (3) identify type of work by use of the following code:
AS**
Architectural details**
MS
Outside Steam Distribution
AS
Architectural
PL
Plumbing
HA
Asbestos Removal
CU
Sanitary
GI
Cover & Index of Drawings
GS
Site Development
GC
Critical Path Method
MP
Steam Generation
ES
Electrical
SS
Structural
FA
Fire Protection
BI
Sub-Surface Investigation
MH
Heating, Ventilating, Air Conditioning, &
Refrigeration