Spinal Cord Injury Center Design Guide
July 1990 (Rev. Jan. 2004)
G.U. Dressing Room 31
Function:
This space provides private changing facilities for SCI Outpatients undergoing G.U. Procedures.
Space Requirement:
100 NSF
Architectural:
Finish Code:
1-A
Floor Finish:
Base:
Vinyl
Wall Finish:
Gypsum Wallboard/Paint
Ceiling:
Acoustical Tile
Ceiling Height:
9'-0"
Noise (STC Rating):
30
Slab Depression:
None
Special Construction:
-
Hardware:
7
Doors:
4'-0" x 7'-0" wood or metal
Windows:
None
HVAC:
Temperature:
Summer: 78@50%RH
Winter:
82@30%RH
Min. Air Changes/Hour: None (see HVAC Note 3)
Min. % Outside Air:
15%
Pressure:
(0)
% Filtration:
30%(PF)/85%(AF)
Noise Criteria:
35
A/C Loads:
Lights:
150w
Equipment: 150w
People:
75w, sensible
75w, latent
Electrical:
Lighting Levels:
Gen. Illum: 10fc
Emergency Power:
One Ceiling Light
Nurse Call
Office of Facilities Management
174