Spinal Cord Injury Center Design Guide
July 1990 (Rev. Jan. 2004)
Nourishment Kitchen 6
Function:
This space is intended for use by staff in providing scheduled nourishments. It should be located in
proximity to the Nurse station.
Space Requirement:
60 NSF
Architectural:
Finish Code:
1-A
Floor Finish:
Base:
Vinyl
Wall Finish:
Gypsum Wallboard/Paint
Ceiling:
Acoustical Tile
Ceiling Height:
8'-0"
Noise (STC Rating):
N/A
Slab Depression:
None
Special Construction:
-
Hardware:
None
Doors:
None
Windows:
None
HVAC:
Temperature:
Summer: 78 @50% RH
Winter:
72 @30% RH
Min. Air Changes/Hour: 10 (Exhaust 100%)
Min. % Outside Air:
15%
Pressure:
Negative
% Filtration:
30%(PF)/85%(AF)
Noise Criteria:
45
A/C Loads:
Lights:
75w
Equipment: 300w
People:
90w, sensible
95w, latent
Electrical:
Lighting Levels:
Gen. Illum: 30fc
Task Illum: 70fc
Emergency Power:
Refrigerator
Office of Facilities Management
65