Spinal Cord Injury Center Design Guide
July 1990 (Rev. Jan. 2004)
Staff Toilet 5-B
Function:
This space is accessible to staff only and should be near the Nurse Station.
Space Requirement:
25 NSF
Architectural:
Finish Code:
2-G
Floor Finish:
Ceramic Tile (slip-resistant)
Base:
Ceramic Tile
Wall Finish:
GWB, 4'-0" Ceramic Wainscot
Ceiling:
Acoustical Tile
Ceiling Height:
8'-0"
Noise (STC Rating):
35
Slab Depression:
None
Special Construction:
-
Hardware:
18
Doors:
3'-0" x 7'-0" wood or metal, undercut
Windows:
None
HVAC:
Temperature:
Summer: -
Winter:
72
Min. Air Changes/Hour:
Min. % Outside Air:
-
Pressure:
Negative
% Filtration:
-
Noise Criteria:
40
A/C Loads:
Lights:
-
Equipment: -
People:
-
Electrical:
Lighting Levels:
Gen. Illum: 30fc
Emergency Power: -
Office of Facilities Management
59