Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 312
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service - Domiciliary
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAIN
CEILING
DOOR
H.W.NO.
SYMBOL
Patient Bed Area:
Patient Bedrooms
VCT
RB
GWB
AT
1/2 H
7
GWB1
AT1
Private & Shared
CT
CT
CT
1/2 H
14
Toilets
4'0"
GWB1
CT
AT (SP)
1/2 H
2
Full Baths
CT
CT
4'0"
CT1
Congregate Baths with
CT
CT
PCP
1/2 L
13
Toilets
Housekeeping Aids Closet
CT
CT
GWB
CT
AT (SP)
1/2 I
13
(SC)
4'0"
Patient Open TV Lounge
CP
RB
GWB-W
AT
Open
Dom Patient
VCT
RB
GWB
AT
1/2 H
40
Multi-Purpose Room
Kitchenette
GWB2
1/2 H2
Quiet Room
CO
RB
AT
52
Office Domiciliary
CP
RB
GWB
AT
1/2 H
52
Assistant
Office Section Leader
CP
RB
GWB
AT
1/2 H
52
Multiple Living
CP
RB
GWB-W
AT
1/2 L
14
Support Facility Area-Administration:
Office, Domiciliary
CP
RB
GWB-W
AT
1/2 H
23
Chief
Office, Assistant Chief
CP
RB
GWB-W
AT
1/2 H
23
Office, Secretary &
CP
GWB
AT
1/2 H-T
23
Waiting
Clerical Space
VCT
RB
GWB
AT
1/2 H-T
23
Office, Staff
CP
RB
GWB
AT
1/2 H-T
23
Lobby
SPECIAL
GWB-W2
AT1
1/2 K-T
40
Conference/Dom. Patient
CP
RB
3
Education Room
Male or Female Toilet
CT
CT
GWB
CT
AT
1/2 H
1
1
Full height ceramic tile on concrete backer board at tub/shower with plaster ceiling.
2
See Design and Construction Procedures PG-18-3, Topic 11, "Noise Transmission Control".
3
Provide acoustical/ tackable wall surface on one wall.
137