Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 276
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service - Radiology
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAIN
CEILING
DOOR SYMBOL
H.W.NO.
Administration:
Office, Chief Radiology
CP
RB
GWB
AT
1/2 S
52
Office, Secretary and
CP
RB
GWB
AT
1/2 S-T
23
Waiting
Office, Administration
CP
RB
GWB
AT
1/2 S-T
23
Assistant
Office, Reception
CP
RB
GWB
AT
1/2 S-T
23
Office, Staff Physician
CP
RB
GWB
AT
1/2 S-T
23
Office, Chief Technician
VCT
RB
GWB
AT
1/2 S-T
23
Education Facilities:
Office, Resident Intern
CP
RB
GWB
AT
1/2 S-T
23
GWB1,2
AT1
Study Cubicle
CP
RB
1/2 U-T
GWB-W1,2
AT1
Conference/Classroom
CP
RB
1/2 U-T
40
Staff Lockers, Lounges,
See Chapter 410
Toilets, and Showers
Main Radiology Suite:
GWB3
AT1,4
15 W/15 X5
Radiographic
106
VCT
RB
Fluoroscopic Room and
Control Area
GWB3
AT1
15 W/15 X1
106
Dedicated Chest Room and
VCT
RB
Control Area
GWB3
AT4
15 W/15 X5
Automated Room (Rapido)
VCT
RB
106
and Control Area
GWB3
AT4
15 W/15 X5
106
All Other (G.P. Rooms
VCT
RB
1
See Design and Construction Procedures PG-18-3, Topic 11, "Noise Transmission Control".
2
Provide acoustical/ tackable wall fabric on one wall.
3
See Architectural Design Manual PG-18-10, Chapter 5, "X-Ray Radiation Shielding and
Special Control Room".
4
2'x2' acoustic tiles to be used in these areas.
5
X width door to be used where VAMC includes an SCI unit.
105