Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 102
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Intensive Care Units
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAINS
CEILING
DOOR
H.W.NO.
SYMBOL
Isolation Bed
VCT
RB
GWB
GWB
3/4 X-T
12
Room*
(SC)
Ante Room*
VCT
RB
GWB
GWB
1/2
12
(SC)
S-T
One Bed
VCT
RB
GWB
AT (SP)
Open/
3/4 X-T1
12
Cubicle/Room
Control Center
VCT
RB
GWB
AT (SP)
Open
Linen Closet
VCT
RB
GWB
AT
11/12
45
U-W
Clean Utility
VCT
RB
GWB
AT (SP)
11/12
45
Room
(SC)
V-W
Soiled Utility
RSF
RB
GWB
AT (SP)
11/12
45
Room
(SC)
V-W
Patient Toilet
CT
CT
GWB
CT
AT
1/2 S
14
4'0"
Lockers, & Toilets
Lounge
CP/VCT
RB
GWB-W
AT
1/2 S
1
Lockers
VCT
RB
GWB
AT
1/2 S-T
68
Toilet
CT
CT
GWB
CT
AT
1/2 S
18
4'0"
Family Waiting
CP
RB
GWB-W
AT
1/2
39
Area
S-T
Public Toilet
-
CT
CT
GWB
CT
AT
1/2 S
19
Male & Female
4'0"
GWB-W2
AT2
1/2 V-T
52
Consultation/
CP
RB
Meditation Room
Head Nurse
CP
RB
GWB-W
AT
1/2 S-T
23
Office
Equipment
VCT
RB
GWB
AT
Open
69
Storage
1
Sliding glass doors with flush bottom rail, or swinging door(s).
2
See Design and Construction Procedures PG-18-3, Topic 11, "Noise Transmission Control".
*
Extend enclosed walls to underside of floor slab above and fully seal them to maintain
proper pressure relationship and direction of air flow.
12