Final Draft 12-31-95
Revised May 1997
Equipment Guide List
SYMBOL
QTY AI
DESCRIPTION
NOTE: PROVIDE PIPING CONNECTION FROM PROCESSORS TO SILVER RECOVERY
SYSTEM, IF REQUIRED.
NOTE: CONNECTIONS, PLUMBING, ELECTRICAL OR MECHANICAL AS REQUIRED
NOTE: FLOOR DRAIN, NEAR FILM PROCESSING UNITS (PLUMBING DESIGN CRITERIA AND
INSTRUCTIONS)
NOTE: FLOOR DRAIN, NEAR REPLENISHER TANK UNITS (PLUMBING DESIGN CRITERIA &
INSTRUCTIONS)
2
CC
COUNTERTOP, PLASTIC LAMINATE, FIXED, WALL MOUNTED,
762mm (30") ABOVE FINISHED FLOOR, 610mm W(24") LENGTH AS
REQUIRED (PG-18-1, MCS 12302)
AR
CC
FLOOR RECEPTOR, FOR REPLENISHER SYSTEM
P-802
1
CC
HOSE BIBB, COMBINATION FAUCET, WALL MOUNTED,
CONCEALED SUPPLY PIPES
(PG-18-1, MCS 15450; PG-18-4, SD 4.2)
P-516
1
CC
SINK, CORROSION RESISTING STEEL, SINGLE
COMPARTMENT, WALL HUNG (PG-18-1, MCS 15450)
AR
VC
PROCESSOR, FILM, AUTOMATIC, 90 SECOND PROCESSING
CYCLE
AR
VC
CONSISTING OF THE FOLLOWING COMPONENTS:
1
BASE MODULE
1
LOADING / UN-LOADING MODULE
6
FILM DISPENSING MODULE
1
CHEMICAL REPLENISHER SYSTEM
1
1
BREAKER PANEL
AR
VV
ILLUMINATOR, X-RAY, 120 VOLT, 20 AMP, WALL MOUNTED,
APROX., 508mm x 1499mm (20" x 59"), 4 PANEL
VA DESIGN GUIDE
RADIOLOGY SERVICE
PAGE 5-4