Final Draft 12-31-95
Revised May 1997
Equipment Guide List
Darkroom (2 Processors) - Darkroom
SYMBOL
QTY AI
DESCRIPTION
NOTE: PROVIDE PIPING CONNECTION FROM PROCESSORS TO SILVER RECOVERY
SYSTEM, IF REQUIRED.
NOTE: CONNECTIONS, PLUMBING, ELECTRICAL OR MECHANICAL AS REQUIRED
NOTE: FLOOR DRAIN, NEAR FILM PROCESSING UNITS (PLUMBING DESIGN CRITERIA AND
INSTRUCTIONS)
NOTE: FLOOR DRAIN, NEAR REPLENISHER TANK UNITS (PLUMBING DESIGN CRITERIA &
INSTRUCTIONS)
AR
CF
DARKROOM CASEWORK
2
CF
CABINET, CASSETTE TRANSFER, FOUR DOOR, W/ AUDIO
1
CC
EYEWASH, WALL MTD.
2
VC
SILVER RECOVERY SYSTEM
1
VC
TANK, REPLENISHER, 95 L (25 GAL.) CAPACITY AND
CURBING, 2 FOR EACH PROCESSOR
P-802
1
CC
HOSE BIBB, COMBINATION FAUCET, WALL MOUNTED,
CONCEALED SUPPLY PIPES
(PG-18-1, MCS 15450; PG-18-4, SD 4.2)
VA DESIGN GUIDE
RADIOLOGY SERVICE
PAGE 5-1