JULY 2005
Design Standards
Phototherapy Treatment Room
Phototherapy Shower Room
Data:
Yes
ARCHITECTURAL
Telephone:
Yes
Coordinate with SFO; refer to Template SFO
Intercom:
--
Section 7, and Schedule C.
Nurse Call:
Yes
TREATMENT ROOM
Public Address:
--
Ceiling:
AT
Radio/Entertainment:
--
Ceiling Height:
2740 mm (9'-0")
MATV:
--
Wall Finish:
Painted GWB
CCTV:
--
Base:
Resilient Sheet Flooring
MID:
--
Floor Finish:
Resilient Sheet Flooring
Security/Duress:
--
TREATMENT ROOM
VTEL:
--
Ceiling:
Portland Cement Plaster
VA Satellite TV:
--
Ceiling Height:
2740 mm (9'-0")
Notes:
--
Wall Finish:
CT, full height
Base:
CT
HEATING, VENTILATING AND AIR
Floor Finish:
CT
CONDITIONING
Slab Depression:
75 mm (3")
Coordinate with SFO; refer to Template SFO
Section 6.5.
LIGHTING
24C (76F)
Dry Bulb Temp Cooling:
Coordinate with SFO; refer to Template SFO
26C (78F)
Section 6.7, 6.7.1, 6.7.5.
Minimum % Outside Air:
100%
General:
50-100 FC Treatment
Yes
Room
Noise Criteria:
NC-40
30 FC Shower/Toilet
Steam:
--
Special:
--
Relative Humidity/Cooling: 50%
Notes:
1. 2' X 4' recessed
fluorescent fixture with
Minimum Air Changes/Hr.: 10
acrylic prismatic lens.
Room Pressure:
Negative
AC Load-Equipment:
5 W/SF
fluorescent fixture with
AC Load-Lighting:
2.0 W/SF
acrylic prismatic lens.
Number of People:
3
--
or fluorescent, drop opal
Notes:
Coordinate equipment
lens, shower light fixture.
heat gains with
UL listed for wet locations.
manufacturer.
POWER
PLUMBING AND MEDICAL GASES
Coordinate with SFO; refer to Template SFO
Coordinate with SFO; refer to Template SFO
Section 6.7, 6.7.1, 6.7.3, 6.7.4 and Schedule B.
Section 6.6 and Schedule B
General:
yes
Cold Water:
Yes
Emergency:
--
Hot Water:
Yes
Notes:
1. Junction box for connec-
Laboratory Air:
--
tion to UV light box at
Laboratory Vacuum:
--
208V. Voltage, phase,
Sanitary Drain:
Yes
and required connection
Reagent grade Water:
--
per equipment
Medical Air:
--
manufacturer.
Medical Vacuum:
--
COMMUNICATION/SPECIAL SYSTEMS
Oxygen:
--
Notes:
--
Coordinate with SFO; refer to Template SFO
Sections 6.7.8, 6.7.9, and Schedule B.
VA DESIGN GUIDE
APPENDIX B
LEASE BASED OUTPATIENT CLINICS
3-6.3