750
Cost and Time Analysis: Life Cost
Table 750-3.
ALTERATION COST ESTIMATE,
EXAMPLE SERVICE MODULE DESIGN,
BUILDING SYSTEM PROTOTYPE DESIGN
Work
Cost
Totals
Remove:
Partitions
800
Doors and frames
200
180
Service container furring
30
Lavatories
600
Lighting fixtures
720
Outlets and switches
370
HVC diffusers
190
Ducts, reheat coils and piping
240
3,330
Install:
X-ray partitions, corridor
3,070
X-ray partitions, room-to-room
6,840
Other corridor partitions
1,630
Other room-to-room partitions
1,060
Lead-lined doors and frames
3,920
Lead glass windows
900
Relocate doors and frames
350
Ceramic tile
610
Replace ceiling tile
600
Protect and patch flooring
350
New water closet
350
Relocate lavatory
200
Light fixtures
1,700
Switches and outlets
1,500
230
HVC diffusers
1,000
Patch gypsum platform
250
Ductwork and insulation
4,050
Temperature controls
750
Reheat coils and piping
3,000
X-ray control conduit and boxes
6,000
X-ray conduit and power wire
1,000
Suction, air and oxygen
2,480
41,840
Subtotal, remove plus install
45,170
General contractor, 12%
5,420
Total cost, Prototype Design
,590
Distributed over 3,500 square feet = .54/sf.
3 - 207