Cost and Time Analysis: Life Cost
Table 750-2.
ALTERATION COST ESTIMATE,
EXAMPLE SERVICE MODULE DESIGN,
CONVENTIONAL DESIGN AND CONSTRUCTION
Work
Cost
Totals
Remove:
Corridor partitions (to structure)
||content||
,050
Room-to-room partitions
630
Office doors and frames
200
350
Flooring
880
Plumbing, lavatories
600
Lighting fixtures
900
HVC diffusers
70
Ductwork, reheat coils and piping
360
5,040
Install:
X-ray partitions, corridor
,800
X-ray partitions, room-to-room
8,180
Other corridor partitions
1,560
Other room-to-room partitions
1,110
Lead-lined doors
3,120
Rehang doors and frames
350
Lead glass windows
900
Ceramic tile
610
Ceiling
3,500
Vinyl asbestos flooring
2,630
New water closet
600
Relocate lavatory
500
300
Supply and return diffusers
1,000
Ductwork and insulation
4,500
Temperature controls
750
Reheat coils and piping
3,000
Light fixtures
2,380
Switches and outlets
1,500
X-ray wireways and power wire
2,000
X-ray control conduit and boxes
6,000
Suction, air and oxygen
2,480
50,770
Subtotal, remove plus install
55,810
General contractor, 12%
6,700
Total cost, conventional
,510
Distributed over 3,500 square feet = .86/sf.
3 - 206