Cost and Time Analysis: First Cost
Table 750-1.
CONSTRUCTION COST ESTIMATE,
EXAMPLE BUILDING SCHEMATIC DESIGN
Integrated Subsystems
Total $
$/OGSF
Sub-total
Structure
8,118,000
9.63
Ceiling
2,009,000
2.38
Partitions
3,060,400
3.63
4,007,900
4.75
Plumbing distribution
1,803,000
2.14
Electrical power distribution
1,945,400
2.31
24.84
Non-System Components
618,000
.73
Basement waterproofing
72,600
.09
Foundations and basement
1,474,000
1.75
Exterior wall
2,558,200
3.04
Penthouse and soffits
254,300
.30
Miscellaneous metals
440,000
.52
Roofing, insulation and
deck surface
344,500
.41
Non-system partitions
139,500
.17
Non-system ceiling
2,700
.01
Finish flooring
457,600
.54
Casework
83,600
.10
927,300
1.10
Misc. building specialties
880,000
1.04
Hospital equipment
1,400,000
1.66
Plumbing fixtures and fittings
751,000
.89
Sterilizers, fume hoods, etc.
463,600
.55
Finish electrical and
control station
927,200
1.10
154,000
.18
14.18
Items Outside Building
Central plant and laundry
1,496,300
1.77
TOTALS
,388,100
.79
3 - 186