740
Example Service Module: Alteration
For the HVC branches, the procedure described above for the opening
configuration was repeated, except that the remaining branches of the
existing layout were taken into account to minimize the new branches
required. Twenty-two supply zones were found to be necessary to serve
this new functional zone layout.
The plumbing branch change are a simple cutting back of domestic water
runs and extension of the medical gas lines to the new radiology room
locations.
The electrical branches are virtually unchanged except for cable variations
within each wireway. But the short conduit runs and junction boxes to the
final lighting and power drops would vary heavily from the original layout.
3 - 160