510
Generalized Needs and Requirements: Hospital Requirements
Table 510-7.
ELECTRICAL POWER DISTRIBUTION REQUIREMENTS
Power (Watts Per Sq. Ft.)
480/277V
208/120V
Lighting
Other
Lighting
Other
Auditorium
0.5
-
9
8
Canteen
2.4
14
0
6
Central Service
2.4
0.5
0
4
Clinics
2.4
0
0
4
Dental Service
2.4
0
0
4
Dietetic Dining
2.4
0
0
2
Dietetic-Kitchen
2.4
24
0
5.8
ECG Laboratory
2.4
0
0
4
EEG Laboratory
2.4
0
0
4
Hemodialysis Unit
2.4
0
0
5.0
Inhalation Therapy
2.4
0
0
4
Laundry
2
30
0
0.5
Library Service
2.4
0
0
0.5
Lobby
1.0
0
0
0.3
Lockers, Lounges, Toilets
1.5
0
0
0.4
& Showers
Medical Illustration
2.0
0
0
4
Nuclear Medicine
1.5
0
0
6.0
Nursing Units
1.5
0
1.3
2.0
Office Functions
3.2
0
0
3.0
Pathology--Clinical Lab
3.0
2.3
0
8.0
Pathology--Morgue
3.0
1.0
0
1.5
Pharmacy
3.0
0
0
0.5
PM&R
3.0
0
0
5.2
Pulmonary Function
3.0
0
0
4.5
Radiology
0.5
3.1
2
17
Recovery
1.5
0
0
4
Research Labs
3.0
2.8
0
7.6
1.0
0
0
1.0
Storage
1.0
0
0
0.5
Surgical Service
10.0
0
5
5
Workshops
2.0
0.5
0
5.0
Circulation Areas
1.5
0
0
0.5
Mech Equip. (HVC)
-
10.2
-
-
2 - 40