400
PROCEDURE
410
INTRODUCTION
1-233
420
PROBLEM ANALYSIS
421
System Applicability
1-235
422
Cost and Time Constraints
1-236
430
DESIGN DEVELOPMENT
431
Building Configuration
1-237
432
Schematic Design
1-242
440
CONTRACT DOCUMENTS
441
1-245
442
Simplification
1-246
443
Production
1-247
444
VA Standards
1-248
450
COST ESTIMATING
451
Subsystem Costs
1-249
452
Target Costs
1-250
453
Functional Area Costs
1-251
460
CONSTRUCTION SCHEDULING
461
Designing for Construction
1-253
462
Interstitial Space
1-255
463
Typical Sequence
1-256