EXTERIOR SIGNAGE: Indicate the location of the exterior signage on the
20.
contract drawings. Use Environmental Graphics Design Program Guide for
development of exterior signage components. The VA will furnish
exterior signage details at the first drawing review.
SITE ENGINEERING AND LANDSCAPING SPECIFICATIONS: Edit the
21.
specifications but do not type them, until directed by the project
manager. Include specifications, other than VA, that are referenced in
the construction documents. Return all drafts.
SITE AND LANDSCAPE DEVELOPMENT ESTIMATE: In the estimate, include all
22.
the work covered by the design documents, except building excavation and
trench work outside of the building walls. Refer to VA Program Guide
PG-18-15, Estimate Submission Requirements.
23.
APPLICABLE DESIGN AND CONSTRUCTION PROCEDURES (PG-18-3) INDEX:
Use the current list of Topics pertaining to the site work.
STRUCTURAL RESISTIVE DESIGN (FORMERLY CD-54)
SITE ENGINEERING AND LANDSCAPING STANDARD DETAILS INDEX: Details not
24.
provided as a hard copy with this A/E Package may be obtained at the
first review.
DETAIL
DATE
TITLE
RAMP FOR DISABLED PERSONE
02514-1
JUN 01
CURB RAMP
02514-2
JUN 01
PARKING STALL LAYOUT
02514-3
JUN 01
COMBINATION CURB-WHEEL STOP
02577-1
JUN 01
MOUNTABLE CONCRETE CURB AND GUTTER
02577-2
JUN 01
25.
APPLICABLE SITE ENGINEERING AND LANDSCAPING MASTER SPECIFICATIONS INDEX:
SECTION
DATE
TITLE
DIVISION 1-GENERAL REQUIREMENTS
ENVIRONMENTAL PROTECTION
01568
OCT 02
DIVISION 2-SITE WORK
EARTHWORK
02200
NOV 02
EARTHWORK (SHORT FORM)
02201
SEP 04
CHAIN LINK FENCE AND GATES
02444
FEB 04