May 2006
Page 70
PG-18-15, Volume B
DD1
DISTRIBUTION OF A/E MATERIAL
PG-18-15B
Design Development 1 Submission (cont)
VA UNITS
EDITING PRINTS
REFERENCE PRINTS
ESTIMATES
CALCULATIONS
OTHER
(Full Size)
(Half Size)
8 Complete Sets
4 Complete
1 Set Auto. Trans.,
2 Complete Sets
2 Complete Sets
TOTALS
Sets
Elect., Energy
5 Fire Protection
4 Sets FA
(without
Cons., HVAC,
Reports
3 Sets AS & ES
construction
Plb., San., Steam
3 Space Accounting
2 Sets GS
manager)
Gen./Dist., Incin.,
Summaries
1 Set AS
and Struct.
3 Asbestos Reports
Basement, First
2 Subsurface
Floor, & other
Investigation Reports
floors that exit to
2 Energy Impact
grade; HA, BI,
Studies
MU, MP, MH
2 Finish Schedules
Incinerator; PL; &
1 Auto. Trans., Elect.,
SS
HVAC, Plb., San., &
Soil Condition
Reports
1 Set Int. Des. Sample
Boards, Sketches, &
marked Spec 09050
2 Activation Equipment
List