DISTRIBUTION OF A/E MATERIAL
PG-18-15B
Schematics 2 Submission (cont.)
VA UNITS
EDITING PRINTS
REFERENCE PRINTS
ESTIMATES
CALCULATIONS
OTHER
(Full Size)
(Half Size)
2 Complete Sets
7 Complete Sets
3 Complete
2 Sets Exit
2 Complete Sets
TOTALS
5 Fire Protection
Sets
1 Set Auto Trans,
4 Sets FA
(without
Reports & 4 Space
1 Gross Area
Electrical,
3 Sets AS. & ES
construction
Accounting
Energy
2 Sets CU
manager)
Summaries
Conservation,
1 Set AS
3 Asbestos Reports
HVAC, Incin.,
Basement, First
1 Auto. Trans., Criteria
Plb, San,
Floor, & other
for Sub-surface
Steam Gen &
floors that exit to
Invest., Elect.,
Dist., & Struct,
grade; HA,MP,W
HVAC, Incinerator,
Incinerator;
Int. Des., Plb., San.,
GS,PL & SS
Steam Gen/Dist, &
Struct. Reports
1 Set Int. Des.
Sketches,
1 List of Samples, &
Loose Samples
1 Traffic Study
PG-18-15, Volume B
S2
May 2006
Page 65