May 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
CONSTRUCTION DOCUMENTS 1
STEAM GENERATION REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
1
Have A/E Submission Requirements (PG-18-15) for the review been
met? List omissions.
2
Have all calculations been revised per comments in last review?
3
Have any major steam pipes been relocated since last review? This
would require a revised stress analysis.
4
Are all valves shown in plans and sections and in accessible locations?
5
Are boiler access catwalks shown to scale in proper relation to boiler
valves?
6
Do structural and architectural drawings show catwalks and equipment
pads?
7
Are all spring type and roller pipe hanger locations shown?
8
Are seismic brace locations shown and braces detailed?
9
Acceptable responses to previous comments?
10
Coordination with other disciplines
11
Compliance with VA National CAD Standard Application Guide and
applicable National CAD Standard modules.
6