A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
DESIGN DEVELOPMENT 2
STEAM GENERATION REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
1
Have A/E Submission Requirements (PG-18-15) for this review been
met? List omissions.
2
Are calculations complete including pipe and equipment sizing, control
and regulating valves, flowmeter systems, steam traps, heating
systems, pipe stress?
3
Are Master Specs to be utilized of current issue?
4
Do all pump calculations include suction head, NPSH, discharge head
(with adequate safety factor), including accurate list of fittings for
5
Is all pipe stress (major steam lines) within ASME B31.1 limits?
6
Are boiler steam nozzle loadings (forces and moments) within
acceptable range?
7
Is adequate clearance shown around all equipment, including fire tube
boiler tube pull space and front and rear door opening?
8
Does design comply with VA Design Manual?
9
Acceptable responses to previous comments?
10
Coordination with other disciplines
11
Compliance with VA National CAD Standard Application Guide and
applicable National CAD Standard modules.
5