May 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
DESIGN DEVELOPMENT 1
STEAM DISTRIBUTION REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
1
Have A/E Submission Requirements (PG-18-15) for this review been
met? List omissions.
2
System design complies with Outside Steam Distribution Design
Manual.
3
Steam and condensate load calculations acceptable?
4
Pipe sizing calculations acceptable?
5
Plan view and sections of tunnels or manholes show adequate space for
maintenance access?
6
Manholes properly ventilated?
7
Manholes properly drained?
8
Piping in manholes arranged to allow thermal expansion without
overstress?
9
System layout drawings show all other underground systems within 20
feet of new system.
10
Acceptable responses to previous comments?
11
Coordination with other disciplines
12
Compliance with VA National CAD Standard Application Guide and
applicable National CAD Standard modules.
4