CONSTRUCTION DOCUMENTS 1
PLUMBING REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
5
e. Hot water heaters, accumulator, & circulating pump
(cont.)
f. Fire, sump, & jockey pumps
g. Water treatment equipment
6
Do plumbing fixture numbers agree with those provided in contract
specifications?
7
Have correct plumbing fixtures been located where required?
8
Has adequate wall space been provided for piping to serve wall-hung
fixtures and back-to-back fixtures?
9
Has location, size, and invert or centerline elevations of sanitary and
storm sewers, water and fuel gas lines been coordinated with
civil/sanitary engineer?
10
Do "P" numbers provided for plumbing fixtures on drawings match
those indicated in specifications?
11
Have piping and fixture locations been coordinated with architectural
and structural drawings?
12
Has freeze protection been considered for water piping?
13
Are floor drains correctly located and sized?
14
Are roof drains correctly located and sized?
15
Has location and number of cylinders of nitrous oxide manifold been
indicated?
16
Has location and number of cylinders of inside oxygen manifold been
indicated?
17
Has exterior oxygen storage pad been indicated?
18
Has location of medical gas alarm panels been shown?
19
Have pressure failure switches for oxygen, nitrous oxide, vacuum, and
compressed air systems been indicated and coordinated with electrical?
20
Are fuel oil tanks for emergency generators provided?
21
Have balancing valves been provided in the domestic hot water
system?