June 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
DESIGN DEVELOPMENT 2
SANITARY REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
1
Have A/E Submission Requirements (PG-18-15) for this review been
met? If not, list omissions below.
2
Were previous VA comments satisfied?
3
Have drawings been prepared in compliance with VA Design &
Construction Procedures & Design Manuals?
4
Have design calculations been submitted for the following systems:
a. Sanitary sewerage
c. Water
d. Irrigation
e. Fuel Gas
f. Water treatment
g. Sewage treatment
h. Water storage
i. Cathodic protection
5
Are sanitary drawings coordinated with plumbing, electrical site, steam
site, and landscape drawings?
6
Coordinate drawings with other disciplines
10