April 1, 1987
VA HANDBOOK 7610.703
CHAPTER 703. NATIONAL CEMETERY SYSTEM - MAINTENANCE AND SERVICE BUILDING
1. APPROVAL OF CRITERIA
Criteria approved by the Department of Veterans Affairs (VA) on September 18, 1984.
Minor revision to Heavy Maintenance approved February 26, 1987.
2. DEFINITION
This chapter defines personnel and vehicle and equipment space requirement for the Department of Veterans
Affairs (VA) national cemeteries.
3. PROGRAM DATA REQUIRED
b. Projected burials/day.
c. Maintenance and service equipment projections by type and quantity.
4. SPACE DETERMINATIONS
Cemeteries having less than 1 burial/day must be planned on an individual project basis.
a. Personnel Facilities
(1) Office, Foreman
(a) 1-6 burials/day ........................................................................................13.9 NSM (150 NSF)
Includes 2.8 NSM (30 NSF) for plan file.
(b) Over 6 burials/day ..................................................................................17.7 NSM (190 NSF)
Includes 2.8 NSM (30 NSF) for plan file and 3.7 NSM (40 NSF) for drafting
table.
(c) Additional Foremen ............................................................................... 7.4 NSM ( 80 NSF)
(d) Parts and Tools Clerk ............................................................................. 7.4 NSM ( 80 NSF)
(Provided only in cemeteries with over 6 burials/day.)
Space for this function may be located in Parts and Tools Storage.
(2) Lunchroom ............................................................................................... 1.4 NSM ( 15 NSF)
per FTE
(Minimum =
16.3 NSM (175 NSF))
(Maximum =
53.5 NSM (575 NSF))
703-1