UTILITY AGREEMENT REQUIREMENTS
DEPARTMENT OF VETERANS AFFAIRS
OFFICE OF FACILITIES MANAGEMENT
DESIGN AND CONSTRUCTION UTILITY RESPONSIBILITIES FOR ARCHITECTS AND
ENGINEERS
LOCATION:
PROJECT TITLE:
PROJECT NO.:
[ ] SCHEMATICS/DESIGN DEVELOPMENT
[ ] CONSTRUCTION DOCUMENTS
DEVELOPMENT OF UTILITIES, PERMITS, AND OTHER SITE FACILITY
RESOURCES
The development of this project should anticipate possible enlargement, and/or utility
connections and site facilities owned and operated by organizations outside of the
Government. The Architect-Engineer should review the conditions of all utilities and site
facilities as they exist and determine their adequacy with regard to the new requirements
imposed by the scope of this project. If the Architect-Engineer should determine during the
development of this project that any on-site or off site utilities and/or facilities owned and
operated by agencies or organizations other than the Department of Veterans Affairs may
require adjustment to facilitate service for this project, it shall include such
recommendations with its submission. Such description should include load requirements,
service characteristics, cost analysis, and schematic drawings, if required, to show the
proposed points of connection. The Architect-Engineer is not authorized, however, to
make any commitments on behalf of the Government to such outstanding organizations.
The Architect-Engineer will investigate various design alternatives for each utility service.
The firm will also prepare appropriate technical data and meet with, or otherwise
coordinate with, the government agency or private utility firm responsible for each utility
service. The Architect-Engineer will submit appropriate recommendations and technical
design data to the Contracting Officer subsequent to this development and evaluation
phase. The Department of Veterans Affairs will then contract the Government agency or
private utility to negotiate the terms of a "Utility Agreement" to construct necessary utility
facilities, obtain permits, or to make arrangements for others to obtain permits.
The Architect-Engineer shall, prior to the first Design Development Review, prepare a
"Permitting Report". This report shall include permitting requirements for all utilities or
1
Form Date: May 1996