HVAC RELATED A/E SUBMISSION REQUIREMENTS
(See VA A/E Submission Requirements, PG-18-15, Volume B, for Major New Facilities, and Major
Additions and Renovations)
SCHEMATIC 1 (S1):
1.
Provide estimated heating and cooling loads based on floor area.
2.
Coordinate estimated preliminary steam demand with steam generation designer.
3.
Investigate condition and available capacity of existing utilities.
4.
Provide description of tentative zoning.
5.
Select three different applicable systems for life cycle cost analysis.
6.
Provide a list of energy conservation measures to be used in design, and life cycle cost analysis.
SCEMATIC 2 (S2):
1.
Provide description of HVAC systems and equipment for each functional space.
2.
Provide complete life cycle cost analysis with specific recommendations and full back-up data.
3.
Provide heating and cooling capacities of each functional area , and block loads for each building.
4.
Indicate tentative locations and sizes of all mechanical equipment rooms, and main shafts.
5.
Show block layouts of major pieces of equipment.
6.
Resolve locations of louvers etc.