Spinal Cord Injury Center Design Guide
July 1990 (Rev. Jan. 2004)
Recovery Room 29
Function:
This space is intended to accommodate patients after Lithotripsy procedures. Here they will be monitored
until the effects of general anesthesia have worn off. This space is provided only when Lithotripsy is
approved and located in the SCI GU Clinic.
Space Requirement:
300 NSF
Architectural:
Finish Code:
1-U
Floor Finish:
Base:
Vinyl
Wall Finish:
Veneer Plaster/Paint
Ceiling:
Acoustical Tile
Ceiling Height:
9'-0"
Noise (STC Rating):
35
Slab Depression:
None
Special Construction:
-
Hardware:
69
Doors:
4'-0" x 7'-0" wood or metal, optional glass view panel.
Windows:
None Required
HVAC:
Temperature:
Summer: 72@50%RH
Winter:
82@30%RH
Min. Air Changes/Hour: 8
Min. % Outside Air:
15%
Pressure:
Positive
% Filtration:
30%(PF)/85%(AF)
Noise Criteria:
35
A/C Loads:
Lights:
800w
Equipment: 1000w
People:
390w, sensible
330w, latent
Electrical:
Lighting Levels:
Gen. Illum: 30fc
Over Bed: 100fc
Emergency Power:
Overbed Lights
One Receptacle per PBPU
Nurse Call
Medical Gases
Office of Facilities Management
168