Spinal Cord Injury Center Design Guide
July 1990 (Rev. Jan. 2004)
Four-Bed Room 4
Function:
This space is intended to primarily accommodate those patients who are less capable of independent
care, and to provide a more supportive atmosphere for those undergoing the initial phase of their
rehabilitation.
See following page for data on 4-Bed Acute/Respiratory Room.
Space Requirement:
670 NSF
Architectural:
Finish Code:
1-A
Floor Finish:
Base:
Vinyl
Wall Finish:
Gypsum Wallboard/Paint*
Ceiling:
Acoustical Tile
Ceiling Height:
9'-0" (8' w/wall mount TV)
Noise (STC Rating):
35
Slab Depression:
None
Special Construction: -
Hardware:
7
Doors:
4'-0" x 7'-0" wood or metal, optional view glass panel.
Windows:
Required by code, operable, see PG-18-3, Topic 1, Codes and Standards.
*Vinyl Wallcovering at Lavoratory
HVAC:
Temperature:
Summer: 72@50%RH
Winter:
82@30%RH
Min. Air Changes/Hour: None (see HVAC Note 3)
Min. % Outside Air:
15%
Pressure:
(0)
% Filtration:
30%(PF)/85%(AF)
Noise Criteria:
35
A/C Loads:
Lights:
1320w
Equipment: 1860w
People:
390w, sensible
330w, latent
Electrical:
Lighting Levels:
Gen. Illum: 10fc
Task Illum: 70fc
Over Bed: 30fc
Emergency Power:
Medical Gasses
Night Lights
Vanity Light
One Receptacle per PBPU
Nurse Call
Office of Facilities Management
46