Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 278
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service Medical Research and Development Research
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAIN
CEILING
DOOR
H.W.NO.
SYMBOL
Glassware Washing
ERF
ERF
CMU
PCP
1/2 V-T
69
and Sterilization
(SC)
Room
Ultralow Freezer
VCT
RB
GWB
GWB
1/2 W
69
Room
1/2 VV-T1
Corridor
VCT
RB
CMU/
AT
82
GWB
Special Instrument Spaces:
Confocal Microscope
VCT
RB
GWB
AT
1/2 V-T
67
Fluorescent
VCT
RB
GWB
AT
1/2 V-T
67
Activated Cell
Sorter (FACS)
Cell Irradiator
VCT
RB
GWB
AT
1/2 V-T
67
Nuclear Magnetic
VCT
RB
GWB
AT
1 QQ-T
82
Spectrometer
Mass Spectrometer
VCT
RB
GWB
AT
1 V-T
67
Polymerase Chain Reaction (PCR):
Airlock (Corridor)
VCT
RB
GWB
AT
1/2 S-T
71
Preparation Lab
VCT
RB
GWB
AT
1/2 V-T
68
PCR Room
VCT
RB
GWB
AT
1/2 S
68
Electrophoresis Room
VCT
RB
GWB
AT
1/2 S
68
Veterinary Medical Unit (VMU):
Animal Receiving and
ERF
ERF
CMU
PCP
20 V-D
69
Examination Room
(SC)
Diagnostic
ERF
ERF
CMU
PCP
20 V-D
69
Laboratory
(SC)
Animal Treatment
ERF
ERF
CMU
PCP
20 V-D
69
Room
(SC)
Quarantine Room
ERF
ERF
CMU
PCP
20 V-D
69
(SC)
Special2
2
Animal Rooms Cubicle
ERF
ERF
CMU
PCP
Housing
(SC)
1
See Section II, "Doors and Hardware".
2
To be determined by project requirements.