Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 262
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service - Ambulatory Care
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAIN
CEILING
DOOR
H.W.NO.
SYMBOL
MAS Reception/ Control
VCT/CP
RB
GWB
AT
1/2 S-T
23
Unit
Waiting Area
VCT/CP
RB
GWB-W
AT
Open
Toilet, Public (Visitor
CT
CT
GWB
CT
AT
1/2 S
1
& Patient)
4'0"
GWB1
1/2 S-T
23
Consultation Room
CP
RB
GWB
Lay-in
Panels
in Grid1
GWB1
Staff/Patient
AT
1/2 V-T
23
VCT
RB
Multi-Purpose
Conference/ Class Room
Nurse Station Area:
Communication Center
VCT/CP
RB
GWB-W
AT
Open
VCT
RB
GWB
AT
1/2 S
43
Staff Toilet
CT
CT
GWB
CT
AT
1/2 S
18
4'0"
GWB1
1/2 S-T
23
Intake/Exit Interview
VCT/CP
RB
GWB
Room
Lay-in
Panels
in Grid1
Clean Utility/Linen,
VCT
RB
GWB
AT
11/12 V-W
45
Stretcher, and Medical
(SC)
Equip. Storage
Soiled Utility Room
RSF
RB
GWB
AT
11/12 V-W
45
(SC)
GWB1
AT1
Multi-Purpose Procedure
VCT
RB
1/2 V
69
Room
Toilet, Wheelchair
CT
CT
GWB
CT
AT
1/2 S
18
4'0"
See Design and Construction Procedures PG-18-3, Topic 11, "Noise Transmission Control".
1
80