Design Standards
Treatment Planning Unit
ARCHITECTURAL
Ceiling:
ADP:
--
Ceiling Ht:
2895 mm (9'-6")
Radio:
--
Wall Finish:
Paint
Telephone:
Wainscot:
--
Yes
Base:
Resilient base
Intercom:
Floor Finish:
Yes
Slab Depr:
Coordinate with
Pub. Addr:
--
equipment manufacturer
Notes: 1. Junction box for CCTV Camera with
Notes:
1220mm (4'-0") wide door. See VA
conduit to Control Room.
Construction Standard 64-1,X-Ray
2. Junction box for CCTV Monitor
cabling.
Control".
SPECIAL EQUIPMENT
CONDITIONING
None
Dry Bulb Temp Cooling:
24C (76F)
25C (78F)
LIGHTING
Minimum % Outside Air:
15%
Yes
General:
Control Room: 30fc-1.6 w/sf
Noise Criteria:
NC-40
Simulator Room: 0-30fc-3.5w/sf
Steam:
Yes
Special:
--
Relative Humidity/Cooling:
50%
Notes:
1. "X-ray in use- Do Not Enter"
Relative Humidity/Heating:
45%
warning sign fixture.
Minimum Air Changes/Hr.:
8
Room Pressure:
Negative
down light with 100w, A-21 lamp.
AC Load Equipment: 4400w (15,000 Btu/hr)
3. Continuous fluorescent
Number of People:
6
direct/indirect wall mounted
--
fixture, acrylic prismatic lens on
Notes:
1. Provide booster humidifier
top and bottom, W/2-F32T8
lamps, 4100 deg. K, CRI=85
PLUMBING AND MEDICAL GASES
(min.)
Cold Water:
Yes
fluorescent light fixture, acrylic
Hot Water:
Yes
lens, w/2-F32T8 lamps, 41000
Laboratory Air:
--
deg. K, CRI=85 (minimum)
Laboratory Vacuum:
--
Sanitary Drain:
Yes
POWER
Reagent Grade Water:
Possible
Medical Air:
Yes
General:
Medical Vacuum:
Yes
Emergency:
--
Oxygen:
Yes
Notes: 1. 480V, 3P flush mounted circuit breaker
Notes:
1. Verify with the equipment supplier
with shunt trip for simulator system.
reguarding sanitary floor drain
Coordinate rating with system supplier.
requirement.
2. Emergency power off (EPO) push
2. Verify with the equipment supplier
button station connect to shunt trip
reguarding cold water and
circuit breakers.
compressed air requirements.
VA DESIGN GUIDE
GUIDE PLATE 4-1