JULY 2005
Design Standards
Pharmacy, Basic Service
Office, Pharmacist/Consultation Room
ARCHITECTURAL
CONDITIONING
Coordinate with SFO; refer to Template SFO
Coordinate with SFO; refer to Template SFO
Section 7, and Schedule C.
Section 6.5.
Ceiling:
AT
26C (78F)
Dry Bulb Temp Cooling:
Ceiling Height:
2740 mm (9'-0")
22C (72F)
Wall Finish:
Painted GWB
Minimum % Outside Air:
15%
Wainscot:
--
--
Base:
Resilient Base
Noise Criteria:
NC-40
Floor Finish:
Carpet
Steam:
--
Slab Depression:
--
Relative Humidity/Cooling:
50%
Sound Protection:
STC 40
Relative Humidity/Heating:
30%
Notes:
Physical Security; see
Minimum Air Changes/Hr.:
4
4.2.7 in Template SFO
Room Pressure:
0
AC Load-Equipment:
2.0 W/SF
LIGHTING
AC Load-Lighting:
1.6 W/SF
Coordinate with SFO; refer to Template SFO
Number of People:
2
Section 6.7, 6.7.1, 6.7.5.
--
Notes:
--
General:
50 FC
Special:
--
PLUMBING AND MEDICAL GASES
Notes:
--
Coordinate with SFO; refer to Template SFO
POWER
Section 6.6 and Schedule B
Coordinate with SFO; refer to Template SFO
Cold Water:
--
Section 6.7, 6.7.1, 6.7.3, 6.7.4 and Schedule B.
Hot Water:
--
Laboratory Air:
--
General:
Yes
Laboratory Vacuum:
--
Emergency:
--
Sanitary Drain:
--
Notes:
--
Reagent grade Water:
--
Medical Air:
--
COMMUNICATION/SPECIAL SYSTEMS
Medical Vacuum:
--
Coordinate with SFO; refer to Template SFO
Oxygen:
--
Sections 6.7.8, 6.7.9, and Schedule B.
Notes:
--
Data:
Yes
Telephone:
Yes
Intercom:
--
Nurse Call:
--
Public Address:
--
Radio/Entertainment: --
MATV:
--
CCTV:
--
MID:
--
Security/Duress:
Yes
VTEL:
--
VA Satellite TV:
--
Notes:
--
VA DESIGN GUIDE
APPENDIX B
LEASE BASED OUTPATIENT CLINICS
2-11.3