JULY 2005
Design Standards
Nurse Station
ARCHITECTURAL
CONDITIONING
Coordinate with SFO; refer to Template SFO
Coordinate with SFO; refer to Template SFO
Section 7, and Schedule C.
Section 6.5.
Ceiling:
AT
26C (78F)
Dry Bulb Temp Cooling:
Ceiling Height:
2740 mm (9'-0")
22C (72F)
Wall Finish:
GWB-W
Minimum % Outside Air:
15%
Wainscot:
--
--
Base:
Resilient Base
Noise Criteria:
NC-40
Floor Finish:
Steam:
--
Or Carpet
Relative Humidity/Cooling:
50%
Slab Depression:
--
Relative Humidity/Heating:
30%
Sound Protection:
--
Minimum Air Changes/Hr.:
4
Notes:
--
Room Pressure:
0
AC Load-Equipment:
2 W/SF
LIGHTING
AC Load-Lighting:
1.6 W/SF
Coordinate with SFO; refer to Template SFO
Number of People:
2
Section 6.7, 6.7.1, 6.7.5.
--
General:
70 FC Day, 30 FC Night
Notes:
--
Special:
--
Notes:
1. Emergency (critical
PLUMBING AND MEDICAL GASES
power source) 50% of
Coordinate with SFO; refer to Template SFO
light fixtures unless
Section 6.6 and Schedule B
adequately illuminated
by corridor light fixtures.
Cold Water:
Yes
Hot Water:
Yes
POWER
Laboratory Air:
--
Laboratory Vacuum:
--
Coordinate with SFO; refer to Template SFO
Sanitary Drain:
Yes
Section 6.7, 6.7.1, 6.7.3, 6.7.4 and Schedule B.
Reagent grade Water:
--
General:
Yes
Medical Air:
--
Emergency:
Yes
Medical Vacuum:
--
Notes:
1. Nurse call and panic
Oxygen:
--
system on emergency
Notes:
--
critical power source.
COMMUNICATION/SPECIAL SYSTEMS
Coordinate with SFO; refer to Template SFO
Sections 6.7.8, 6.7.9, and Schedule B.
Data:
Yes
Telephone:
Yes
Intercom:
Yes
Nurse Call:
Yes
Public Address:
Yes
Radio/Entertainment: --
MATV:
--
CCTV:
--
MID:
--
Security/Duress:
--
VTEL:
--
VA Satellite TV:
--
Notes:
--
VA DESIGN GUIDE
APPENDIX B
LEASE BASED OUTPATIENT CLINICS
2-8.3