JULY 2005
Design Standards
Laboratory, General
ARCHITECTURAL
CONDITIONING
Coordinate with SFO; refer to Template SFO
Coordinate with SFO; refer to Template SFO
Section 7, and Schedule C.
Section 6.5.
Ceiling:
AT (SP)
23C (75F)
Dry Bulb Temp Cooling:
Ceiling Height:
2740 mm (9'-0")
22C (72F)
Wall Finish:
Painted GWB
Minimum % Outside Air:
100%
Wainscot:
--
Yes
Base:
Resilient Base
Noise Criteria:
NC-45
Floor Finish:
Steam:
--
Slab Depression:
--
Relative Humidity/Cooling:
50%
Sound Protection:
--
Relative Humidity/Heating:
30%
Notes:
--
Minimum Air Changes/Hr.:
12
Room Pressure:
Negative
LIGHTING
AC Load-Equipment:
3.9 W/SF
Coordinate with SFO; refer to Template SFO
AC Load-Lighting:
3 W/SF
Section 6.7, 6.7.1, 6.7.5.
Number of People:
5
--
General:
50 FC
Notes:
--
Special:
--
Notes:
--
PLUMBING AND MEDICAL GASES
POWER
Coordinate with SFO; refer to Template SFO
Section 6.6 and Schedule B
Coordinate with SFO; refer to Template SFO
Section 6.7, 6.7.1, 6.7.3, 6.7.4 and Schedule B.
Cold Water:
Yes
Hot Water:
Yes
General:
Yes
Laboratory Air:
Refer to SFO
Emergency:
Yes
Laboratory Vacuum:
Refer to SFO
Notes:
--
Sanitary Drain:
Yes
Reagent grade Water:
Refer to SFO
COMMUNICATION/SPECIAL SYSTEMS
Medical Air:
--
Coordinate with SFO; refer to Template SFO
Medical Vacuum:
--
Sections 6.7.8, 6.7.9, and Schedule B.
Oxygen:
--
Notes:
--
Data:
Yes
Telephone:
Yes
Intercom:
--
Nurse Call:
--
Public Address:
--
Radio/Entertainment: --
MATV:
--
CCTV:
--
MID:
--
Security/Duress:
--
VTEL:
--
VA Satellite TV:
--
Notes:
--
VA DESIGN GUIDE
APPENDIX B
LEASE BASED OUTPATIENT CLINICS
2-5.3