Heating-Ventilating-Cooling: Target Costs
345.2.2
Not Included
1. Central plant equipment, such as boilers, chillers and cooling towers;
2. plumbing and electrical equipment and distribution not required
exclusively for the HVC subsystem;
3. grilles and louvers in the exterior wall;
4. special equipment for controlled environment rooms, refrigerators,
hyperbaric chambers, etc.;
5. hoods for kitchens and laboratories; and
6. site work and utilities.