330
Partitions: Target Costs
338
TARGET COSTS
338.1
RANGE
The total cost of the partition subsystem will range between .75 and
.00 per lineal foot of partition, or .33 to .88 per OGSF of building.
(See Section 751.2.3.)
338.2
SCOPE
338.2.1
Included
1. All full height (i.e., floor-to-ceiling and floor-to-structural slab) interior,
non-loadbearing partitions including fixed, relocatable, operable and
portable types;
2. interior door sets required in the above partitions, including doors,
transoms over, and floor-to-ceiling frames;
3. hinges and sealing devices required for the above doors;
4. furring around surface mounted service distribution lines;
5. furring around interior columns and shear walls as required;
6. interior glazed units including glass and solid panels, and floor-to-
ceiling frames;
7. baseboard and trim (except bases integral with floor);
8. support for wall-hung casework and equipment such as fire
extinguishers and hose reel cabinets; and
9. finishes required on above items, including both field and factory
applied.
338.2.2
Not Included
1. Load bearing, exterior and shear walls;
2. special insulation or shielding;
3. tackboards and chalkboards;
1 - 186