EQUIPMENT GUIDE LIST - CHAPTER 276
07-02
RADIOLOGY SERVICE
SYMBOL
QNTY
ACQ/INS
DESCRIPTION
SPEC
REFERENCE
DETAIL
NOTE: PROVIDE INTERCOM STATION IN CONTROL BOOTH
CONNECTED TO REMOTE STATION IN X-RAY ROOM, WHEN CONTROL
BOOTH IS SEPARATED FROM X-RAY ROOM.
AR
CC
INCANDESCENT, DIMMING SYSTEM
16510
AR
CC
LIGHT, WARNING (DO NOT ENTER) OVER DOOR
SPECIAL PROCEDURE SUPPORT AREA (ONE PER SUITE):
P-520
AR
CC
SINK, SURGEONS, SCRUB-UP, SENSOR CONTROL
15450
T45
AR
CC
SHELF, CORROSION RESISTING STEEL, 305 mm X 127 mm (12" X 5")
10801
10801-1.DWG
DISPENSER, SOAP, WITH FOOT CONTROL, WALL MOUNTED OVER
AR
CC
SINK
10800
AR
VV
DISPENSER, PAPER TOWEL, SURFACE MOUNTED
AR
VV
DISPENSER, BRUSH, SCRUB
1
VV
HOOK, COAT, WALL MOUNTED
1
VV
RECEPTACLE, WASTE, 330 mm (13") DIAMETER
CABINET, DRUG STORAGE, DOUBLE LOCKING DOORS, WALL HUNG
1
CF
WITHOUT BASE, 610 mm X 330 mm X 762 mm (24" X 13" X 30")
1
VV
CLOCK, BATTERY OPERATED
FILM PROCESSING ROOM:
PROCESSOR, FILM, AUTOMATIC, THRU-THE-WALL TYPE, CAPACITY,
1
VC
120 FILMS PER HOUR, 813 mm X 889 mm X 1219 mm (32" X 35" X 48")
-OR-
PROCESSOR, FILM, AUTOMATIC, THRU-THE-WALL TYPE, CAPACITY,
1
VC
185 FILMS PER HOUR, 762 mm X 2184 mm X 1118 mm (30" X 86" X 44")
-OR-
PROCESSOR, FILM, AUTOMATIC, 90 SECOND PROCESSING CYCLE,
1
VC
THRU WALL
FLOOR DRAIN, NEAR FILM PROCESSING UNITS (PLUMBING DESIGN
1
CC
CRITERIA AND INSTRUCTIONS)
TANK, REPLENISHER, 95 L (25 GAL.) CAPACITY AND CURBING, 2 FOR
1
VC
EACH PROCESSOR
FLOOR DRAIN, NEAR REPLENISHER TANK UNITS (PLUMBING DESIGN
1
CC
CRITERIA & INSTRUCTIONS)
Page 16