20. INDEX OF APPLICABLE VA DESIGN AND CONSTRUCTION PROCEDURES:
20.1 The following should be used as a checklist to assure that you have been
furnished the current VA Design and Construction Procedures relating to steam
generation:
Drawings
Piping, Ducts, and Electrical Conduits
Natural Disasters Non-Structural Resistive Design (CD-54)
Physical Security Strategies for New and Renovation VA Construction
21. INDEX OF STEAM GENERATION NATIONAL CAD STANDARDS DETAILS:
TITLE
DETAIL
DATE
Abbreviations
15051-1
03-06
Abbreviations
15051-2
03-06
Abbreviations
15051-3
03-06
Access Platform Arrangement, Fire Tube Boiler
15622-3
03-06
Access Platform Arrangement, Water Tube Boiler
15624-2
03-06
Anchoring, Equipment
15625-13
03-06
Blowoff Tank
15625-8
03-06
Boiler, Fire Tube
15622-2
03-06
Boiler, Water Tube
15624-1
03-06
Chemical Feed System, Pump Type
15625-3
03-06
Drip Pocket, Steam Line
15339-2
03-06
15051-4
03-06
Blowoff Tank
15051-4
03-06
Boiler Economizers
15051-4
03-06
15051-4
03-06
Chemical Feed System
15051-5
03-06
Compressed Air Dryer
15051-4
03-06
Condensate Storage Tank
15051-4
03-06
Continuous Blowdown Heat Exchanger
15051-5
03-06
Earthquake Automatic Gas Shutoff Valve
15051-6
03-06
Emergency Gas Safety Shutoff Valve
15051-5
03-06
Feedwater Deaerator
15051-4
03-06
Flash Tank
15051-6
03-06
15051-6
03-06
Fuel Oil Tanks
15051-5
03-06
15051-6
03-06