Conduit and Boxes
7.4
Drawings and Details
7.11
Ducts
7.7
Enclosed Cable Trays
7.6
Enclosed Wireways
7.6
General Requirements
7.2
Head End Equipment Room
7.12
Installation Requirements
7.10
Open Wireways
7.5
Terminal Cabinets
7.9
Wires and Cables
7.3
SEISMIC BRACING
CD-54
1.12
Details
1.12.2
List of Equipment to be Braced
1.12.3
Seismic Bracing Calculations
1.11(f)
Specification Section
1.12.1
Definition
4.5.3
SPECIAL PROCEDURE ROOM, CRITICAL BRANCH
4.6.1.2(dd)
SUBMETERING
Boiler Plant
5.1.1.1(a)
Chiller building
5.1.1.1(a)
Energy Center
5.1.1.1
Laundry Building
5.1.1.1
New Separate Buildings
5.1.2
SURGICAL ROOMS
Large-scale plans
1.9(f)
Operating Suite, Critical Branch
4.6.1.2(s)
Recovery Room, Critical Branch
4.6.1.2(t)
SMOKE PARTIONS
See "Fire Alarm"
SPECIFICATIONS
1.9(j)
Drawing coordination
1.9(j)(2)
Editing
1.9(j)(1)
New Sections
1.9(j)(3)
STAT
Definition
4.5.4
SWITCHGEAR
Large-scale Plans
1.10.1(e)
Location
1.9(d)
Schedule
1.9(c)
Seismic Bracing
1.12
Definition
4.5.5
TELEPHONE/DATA/TELECOMMUNICATIONS
Basement
8.13
Cable Trays
8.4
Cellular Floors
8.6
Closets
8.15, 8.17
Closets, Design Requirements
1.9(a)
Closets, Installation
7.10
Conduits and Boxes
8.3
Critical Branch
4.6.1.2(u)
Details
8.9
Enclosed Cable Trays
8.5
Enclosed Wireways
8.5
ELECTRICAL DESIGN MANUAL
I-10
INDEX