DATE
SHEET NO.
ESTIMATE WORKSHEET
OF
PROJECT NO.
LOCATION
PROJECT NAME
101-001
VAMC, ANY CITY, USA
SAMPLE PROJECT
NEW
ALT.
TYPE OF ESTIMATE
ESTIMATOR
INDEX NO.
BUILDING NO./NOS.
ESTIMATE NO.
DD1
JOHN DOE
X
1000.0
12
CD-1
CODE
LABOR
MATERIALS
SYSTEM/SUBSYSTEM
TOTAL
A
B
C
D
QUANTITY
UI
N
T
$/UNIT
TOTAL
QUANTITY
UI
N
T
$/UNIT
TOTAL
COST
SUBSTRUCTURE
55,255
SF
.49
27,217
55,255
SF
.92
50,858
78,075
02
SLAB ON GRADE
55,255
SF
.49
27,217
55,255
SF
.92
50,858
78,075
10
10 MIL POLY
55,255
SF
.02
1,105
55,255
SF
.05
2,763
3,868
01
EDGE FORM
3,350
LF
2.00
6,700
3,350
LF
.50
1,675
8,375
02
4000 PSI CONC. CURED
844
CY
23.0
19,412
844
CY
55.0
46,420
65,832
03
5
0
BASEMENT WALLS
-0-
30
SUPERSTRUCTURE
03
FLOOR (AT MECHANICAL
2,980
SF
.47
1,406
2,980
SF
.93
3,194
4,600
10
WIRE MESH
32
SF
8
256
32
SF
16.0
512
768
01
0
4000 PSI CONC.
49
CY
50.5
2,475
2,475
02
00
PUMP CONC.
49
CY
4.00
196
49
CY
3.00
147
343
03
PLACE, FINSIH, CURE
2,980
SF
.32
954
2,980
SF
.02
60
1,014
04
HO-18a
VA FORM
DEC 1995