2.4.2.3 As project planning proceeds, ensure that the listed depressions are
adjusted to suit the actual equipment provided and to satisfy the actual
conditions required by the specific design.
2.4.3 FLOOR DEPRESSIONS IN VA HOSPITAL BUILDING SYSTEM (VAHBS)
Where hospitals are designed in accordance with the VAHBS, a 75 mm (3 in.)
topping is installed over the entire structural slab. Exceptions occur in
areas requiring depressions greater than 75 mm (3 in.). In these areas,
modify the framing and depress the floor slab in accordance with the
requirements of the proposed equipment.