VA hires the best A/E firms in the country and yet we experience repeated
errors and omissions on every project. These are not new or unusual
items, but they consistently get past A/E and VA quality assurance reviews
and result in construction change ord ers. Please review your project
documents and make sure you do not make these mistakes.
Development Phase:
Specifications, Contract Document Phase :
o
Edit master specifications for each project. Delete all nonapplicable text including,
spec writer notes or other editing "//" marks. Insert text for items not included in the
master specifications. Coordinate closely with drawings.
o
Coordinate all specification paragraphs. If a product is deleted, edit related applicable
publications and part three text as well. Conversely, if a product is added then include
its related publications and add execution or installation instructions.
o
Use correct terminology. Ensure that terminology on drawings is the same as used in
the project specifications. When a general term like plaster is used, identify clearly its
type, like gypsum or cement. Do not use vague terms like "see drawings" in
specifications, or "see specifications" on drawings, except for specific reference to a
section or a drawing number. Do not duplicate notes on drawings which are part of
specifications. Do not use terms like "etc.", "and/or", or words which do not specifically
quantify or qualify products or installation.
o
When including specifications for new products, follow three-part format of VA master
specifications. Write generic (descriptive, performance or reference standards)
specifications.
o
Do not write proprietary specifications or descriptive specifications which restrict
procurement to a single source. Where sole source products must be used , it is
necessary for the Project Manager to get a written approval from the General Counsel
to do so. In such cases, define material requirements, and identify the sole source as
follows; "Product as manufactured by ----------- and conforming to this specification is
acceptable." Also, for such exceptions, include VAAR clause 852.236-90, in section
01001, General Conditions.
o
Do not use commercially available specifications without editing for compliance with
Federal Acquisition Regulations (FAR), part 10, and format of VA master
specifications.
AEQA 10-95
Facilities Management Office
Department of Veterans Affairs