Design
Issue
Revised Subject
Alert #
Date
Date
ARCHITECTURAL
DA-68
4-21-97
Exterior Insulation Finish Systems (EIFS) Failures
Create New Solutions
DA-64
2-18-97
Lead Lined Doors and Frames
DA-52
4-8-96
Isolation Room Walls, Floors, and Ceilings
DA-49
4-29-96
6-3-97
Architectural and Engineering Controls in Mycobacterial
Laboratories (Rescinded)
DA-48
2-5-96
Kitchen Floors Under Rack Ovens
DA-46
11-8-95
Lead Exposure in Construction
DA-41
9-6-95
Old Metal Studs
DA-40
8-31-95
Shaft Walls
DA-36
5-18-95
Locking Systems
DA-31
3-7-95
Radiographic/Fluoroscopic Rooms Ceiling Layout
Coordination
DA-24
11-30-94
Building Exterior - Coordination Problems between
Architectural and Structural Design
DA-22
11-21-94
Structural Steel Prime Painting within Interstitial Space
DA-21
11-21-94
Architectural Features - Missing Structural Designs
DA-20
11-18-94
Guard/Handrails for Stairs, Parking Decks, and
Balconies, etc.
DA-18
11-9-94
Atrium Skylights Maintenance Provisions
DA-15
11-3-94
Metal Studs
DA-13
11-1-94
Leaded Paints on Site Removal
DA-12
10-31-94
Architectural Floor Plans and Finish Schedules
Discrepancies
DA-11
10-25-94
Lead Abatement
DA-10
10-25-94
Isolation Rooms, Bathrooms & Toilet Ceilings
DA-09
10-25-94
Radiology Area Walls
AUTO TRANSPORT
DA-44
10-16-95
DA-32
4-13-95
Elevator Hoistway Smoke Venting
February 2007
Index by Technical Discipline
8