VA hires the best A/E firms in the country and yet we experience repeated
errors and omissions on every project. These are not new or unusual
items, but they consistently get past A/E and VA quality assurance reviews
and result in construction change orders. Please review your project
documents and make sure you do not make these mistakes.
HVAC, Design Development Phase : (cont inued)
o Ensure provisions are made for sound attenuation in the HVAC systems to maintain
noise criteria in the rooms;
o Consider equipment vibration noise especially in steel frame buildings and for roof
mounted equipment;
o Coordinate with Plumbing designer cold water connection for condenser water filter
backwash system;
o Provide stainless steel exhaust from glassware washers;
o Provide stainless steel capture hoods above ethylene oxide cylinder storage areas in
the SPD;
o Coordinate all structural supports required for mechanical equipment, ductwork and
piping with the Structural designer;
o Provide enough headroom under the floor mounted air handling units for installation of
drain traps required for condensate disposal from the cooling coils;
o Double check ceiling spaces for installation of ductwork and piping. Show sections at
critical headroom areas;
o Ensure proper mixing of outside and return air in the intake plenums for air handling
units to avoid freezing of coils; and
o Ensure where asbestos is abated from pipes, they are specified to be reinsulated.
AEQA 10-95
Department of Veterans Affairs
Facilities Management Office