DISTRIBUTION OF A/E MATERIAL
PG-18-15F
Schematics 2 Submission
VA UNITS
EDITING PRINTS
REFERENCE PRINTS
ESTIMATES
CALCULATIONS
OTHER
(Full Size)
(Half Size)
2 Complete Sets
2 Sets Exit
7 Complete Sets
3 Complete
2 Complete Sets
TOTALS
5 Fire Protection
1 Set Auto Trans,
Sets
4 Sets FA
(without
Reports & 4 Space
Electrical, Energy
1 Gross Area
3 Sets AS. & ES
construction
Accounting
Conservation,
2 Sets CU
manager)
Summaries
HVAC, Incin., Plb.,
1 Set Architectural
3 Asbestos Reports
San., Steam Gen
Basement, First
1 Auto. Trans., Criteria
& Dist., & Struct.,
Floor, & other
for Sub-surface
floors that exit to
Invest. Elect. HVAC,
grade; HA; MU;
Incinerator, Int. Des.,
MP MH;
Plb., San., Steam
Incinerator; GS;
Gen/Dist, & Struct.
PL; & SS
Reports
1 Set Int. Des.
Sketches,
1 List of Samples, &
Loose Samples
1 Traffic Study
Program Guide, PG-18-15, Volume F
Schematics
June 2006
Page 28