A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
DESIGN DEVELOPMENT 1
SITE REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
e. Accessibility requirements
6
(cont.)
(1) Accessible parking and van spaces
(2) Accessible curb ramps
(3) Accessible ramps (exterior)
f. Mechanical equipment pads (coordinate with Mechanical)
g. Electrical equipment pads (coordinate with Electrical)
h. Expansion , contraction, and construction joint locations
i. Construction limits
j. Underground utilities (coordinate with other disciplines)
(1) Power
(2) Telephone
(3) Water
(4) Gas
(5) Sewer
(7) Fuel tanks/O2 tanks
k. Light poles and fire hydrants (coordinate with other disciplines)
7
GRADING PLAN - Do drawings show:
a. First floor building elevations (coordinate with Architectural)
b. Spot elevations at structure corners, entrances, exits, platforms and
other critical areas (coordinate with Architectural)
c. Elevations of equipment at grade (coordinate with other
disciplines)
d. Contour lines
(1) Existing
(2) New
e. Storm drainage inlet elevations (coordinate with Sanitary)
f. Existing grades
g. Grading limits
8
ROCK EXCAVATION (Quantity)
9
Compliance with VA National CAD Standard Application Guide and
applicable National CAD Standard modules.
7