June 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
SCHEMATIC 2
PLUMBING REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
1
Have A/E Submission Requirements (PG-18-15) for this review been
met? If not, list omissions below.
2
Were previous VA comments satisfied?
3
Have drawings been prepared in compliance with VA Design &
Construction Procedures?
4
Have correct plumbing fixtures been located where required?
5
Coordinate drawings with other disciplines
SCHEMATIC 2
FIRE PROTECTION REVIEW
(Related to Plumbing/Sanitary Engineering)
COMMENTS/
NO.
ITEM
YES/NO/NA
1
Have A/E Submission Requirements (PG-18-15) for this review been
met? If not, list omissions below.
2
Were previous VA comments satisfied?
3
Have drawings been prepared in compliance with VA Design &
Construction Procedures and Design Manuals?
4
Coordinate drawings with other disciplines
4