December 2001
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
SCHEMATIC 1
INCINERATION/SOLID WASTE REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
1
Have A/E Submission Requirements (PG-18-15) for this review been
met? List omissions.
2
Is seismic anchoring and bracing necessary?
3
Does A/E have latest VA Master Spec sections?
4
Does A/E have latest VA Standard Details (for heat recovery boiler)?
5
Does A/E have latest VA Design Manual?
SCHEMATIC 2
INCINERATION/SOLID WASTE REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
1
Have A/E Submission Requirements (PG-18-15) for this review been
met? List omissions.
2
Equipment selection and location complies with Solid Waste
Processing Systems Design Manual.
3
Life cycle cost method complies with NIST Handbook 135?
4
Acceptable responses to previous comments?
3